This guide explains how to:
set up a Callout Project in MYOB Acumatica
configure FieldInsight so technician callout timesheets default to that project and job
log time, materials, allowances, and expenses against the callout job
move the callout job to another project when needed
Overview
A Callout Project acts as a holding project for technician callout work. When a technician logs a timesheet using the Callout activity type, FieldInsight can automatically assign that entry to the nominated callout project and job.
Later, if the work needs to be linked to a different project, the callout job can be moved, and the related timesheets, materials, and expenses will move with it.
Before You Start
Before setting this up in FieldInsight, you need to create a project in MYOB that will act as your callout project.
In the example shown in the transcript:
a customer was selected
the admin task/cost code was used
the project was created as a bucket for technician callout timesheets
the project was named Callout Project
a Callout Task was added
Once the project and task are fully activated in MYOB, they will sync through to FieldInsight.
Part 1: Set Up the Callout Project in MYOB
Step 1: Create the project in MYOB
Create a project in MYOB that will be used as the default project for callout work.
When setting it up:
Select the relevant customer
Choose the required admin/cost code setup
Name the project something clear, such as Callout Project
Add a task, such as Callout Task
Complete the activation process in MYOB
Once activated, the project and task will sync into FieldInsight.
Step 2: Confirm the project has synced to FieldInsight
After the sync completes, check that the project is available in FieldInsight.
You should be able to find:
the Callout Project
the related Callout Job
This is the project and job that technicians will use when entering callout timesheets.
Part 2: Configure Timesheet Settings in FieldInsight
Step 3: Set the default callout project and job
To make sure callout timesheets automatically default to the correct project and job:
Go to Settings
Open Job Manager
Select Timesheets and Payroll
Click General
Scroll down to the Callout Project section
Select your Callout Project
Select the related Callout Job Visit
Click Save
Once this is configured, technicians who choose the Callout activity type on a timesheet will automatically default to this project and job.
Part 3: Log Time Against the Callout Project
Step 4: Enter a callout timesheet as a technician
To log time against the callout project:
Log in as a Technician
Click + Timesheet
In Activity Type, choose Callout
When you select Callout, FieldInsight will automatically populate:
the Callout Project
the Callout Job
This saves the technician from needing to manually choose the project and job.
Step 5: Add time and other costs
From the timesheet screen, the technician can then enter the relevant details, such as:
hours worked
allowances such as meal allowance
materials consumed
expenses
For expenses, the technician can select the relevant item code, apply it, and continue filling out the record.
Once everything is entered, click Save.
Part 4: View the Callout Job in Scheduler
Step 6: Find the callout job
To review callout jobs:
Go to the Scheduler
View the jobs created for the day
Use filters if needed to search by project
Search for the Callout Project
This allows you to see the main callout job and any related callout job visits created from it.
Step 7: Review time, materials, and expenses
Open the callout job and go to Time and Materials.
From here, you can review everything logged against the callout job, including:
timesheets
products/materials
expenses
This confirms that the technician’s callout entry has flowed through correctly.
Part 5: Move the Callout Job to Another Project
Step 8: Move the job
If the callout work needs to be reassigned to another project:
Open the callout job
Click the down arrow next to the date
Select Move
Choose the project you want to move the callout job to
Click Select
FieldInsight will then move the callout job to the selected project.
What happens when the job is moved?
When a callout job is moved to another project, FieldInsight automatically transfers the related records to the new job, including:
timesheet entries
products/materials
expenses
The system also keeps a record of the relationship between the original callout job and the new job.
In the Visits tab, you can see:
the original selected job
the newly created visit under the target project
the recreated timesheet, product, and expense entries
This gives you traceability from the original callout entry through to the final project it was assigned to.
Expected Outcome
After completing this setup:
technicians can log Callout timesheets quickly
timesheets automatically default to the nominated callout project and job
time, materials, allowances, and expenses are captured in one place
callout work can later be moved to the correct project without re-entering information
Summary
Using a callout project in MYOB and FieldInsight helps standardise how unplanned or callout work is captured.
The workflow is:
create a callout project and task in MYOB
let it sync to FieldInsight
configure the default callout project and job in timesheet settings
have technicians log time using the Callout activity type
move the callout job to another project when needed
This makes callout work easier to track while still allowing it to be assigned to the correct project later.